Bathroom Remodeling in Louisville, KY
Walk-in showers, tub-to-shower conversions, custom tile and new vanities, built watertight to last.
- Free in-home estimates
- Written, line-item quotes
- Licensed & insured
- One project lead, start to finish
- Permits handled for you
- Clean, protected job sites
What's included
A bathroom has to look good and stay dry for decades. We take both seriously: real waterproofing under every tiled shower, correct slope to the drain, and ventilation sized for the room. From a quick hall bath update in Okolona to a full primary suite in Prospect, we handle the design, plumbing, electrical, tile and permits.
Walk-in showers
Curbless and low-curb showers, built-in niches, benches, rain and handheld shower heads.
Tub-to-shower
Swap a dated tub-shower combo for a tiled walk-in shower, usually in 1–2 weeks.
Tile work
Large-format porcelain, marble-look, subway and patterned floors laid flat and true.
Vanities & storage
Single and double vanities, quartz tops, medicine cabinets and linen storage.
Aging in place
Grab-bar blocking, comfort-height toilets, curbless entries and wider doorways.
Ventilation & lighting
Quiet exhaust fans vented outside, vanity lighting and optional heated floors.
Tub-to-shower conversions
Most Louisville homes built before 2000 have a 5-foot tub-shower combo that rarely gets used as a tub. We replace it with a tiled walk-in shower that is easier to step into and easier to clean.
- Old tub and surround removed, valve and drain updated
- Waterproofing membrane on walls and floor, sloped to the drain
- Tile of your choice, a niche for bottles and an optional bench
- Frameless or semi-frameless glass door or fixed panel
- Usually 1–2 weeks of construction
Bathroom Remodeling cost in Louisville
Typical 2026 ranges for Louisville-area homes, including labor and materials.
| Project | What's usually included | Typical range |
|---|---|---|
| Tub-to-shower conversion | Remove the tub, waterproof, tile a walk-in shower with a glass door and new valve. | $9,000 – $16,000 |
| Hall or guest bath remodel | New vanity, toilet, tile floor, tub or shower surround, lighting and ventilation. | $14,000 – $28,000 |
| Primary bathroom remodel | Larger walk-in shower, double vanity, heated floors or freestanding tub, layout changes. | $28,000 – $65,000+ |
Your written quote is based on your measurements and selections. Permit fees are included.
How long it takes
| Phase | Typical time | Notes |
|---|---|---|
| Consultation & design | 1–3 weeks | Layout, tile and fixture selections, written quote. |
| Permits | About 1–2 weeks | Needed when plumbing or electrical changes. |
| Tub-to-shower | 1–2 weeks | Construction time once materials are on site. |
| Full bathroom | 2–6 weeks | Depends on size and whether the layout changes. |
What we recommend
| Item | Our go-to | Why |
|---|---|---|
| Waterproofing | Sheet or liquid membrane | Keeps water out of the walls and subfloor. |
| Shower tile | Porcelain | Dense, low-absorption and easy to clean. |
| Glass | 3/8" frameless or semi-frameless | Makes a small room feel larger. |
| Exhaust fan | Sized to the room, vented outside | Controls humidity and mold. |
Our remodeling process
Free in-home consultation
We visit, measure the room, look at what's behind the walls where we can, and talk through what you want and your budget.
Design and selections
We lay out the space and help you choose cabinets, counters, tile and fixtures. Every choice is confirmed in writing.
Written, line-item quote
You get a fixed price broken down by line, so you can see exactly what you're paying for.
Permits and ordering
We pull the permits and order materials. Demolition starts only once the long-lead items are confirmed.
Build
Demolition, rough-in, inspections, then cabinets, tile and finishes. Your project lead keeps you updated every week.
Final walkthrough
We walk the finished room with you, fix anything on the punch list and leave the space clean.
Looks we can build in your home
Bathroom Remodeling near you
Louisville neighborhoods
- The Highlands40204
- Cherokee Triangle40204
- Crescent Hill40206
- Clifton40206
- Germantown40217
- Old Louisville40208
- St. Matthews40207
- Beechmont40214
East End & Jefferson County
- Jeffersontown40299
- Middletown40243
- Lyndon40222
- Hurstbourne40222
- Anchorage40223
- Prospect40059
- Norton Commons40059
- Fern Creek40291
- Okolona40219
- Valley Station40272
- Shively40216
Surrounding counties
- La Grange40031
- Crestwood40014
- Shelbyville40065
- Mt. Washington40047
- Shepherdsville40165
Southern Indiana
- Jeffersonville47130
- New Albany47150
- Clarksville47129
Bathroom Remodeling FAQ
How long does a bathroom remodel take?
A tub-to-shower conversion usually takes 1 to 2 weeks of construction. A full hall bath takes 2 to 4 weeks, and a primary bath with layout changes 4 to 6 weeks.
Is converting my tub to a walk-in shower a good idea?
If you rarely use the tub, yes. A walk-in shower is easier to get in and out of, easier to clean and feels larger. If it's the only tub in the house and you have young children, we may suggest keeping one tub elsewhere.
How do you prevent leaks and mold?
We install a continuous waterproofing membrane behind and under all shower tile, slope the shower floor to the drain, and size the exhaust fan for the room. That matters in the Ohio Valley's humid summers.
Can you make my bathroom safer for aging in place?
Yes. We install curbless or low-curb showers, wall blocking for grab bars, a bench, a handheld shower and comfort-height toilets, and can widen doorways where the framing allows.
Do I need a permit for a bathroom remodel in Louisville?
If plumbing or electrical is being moved or added, yes. We handle the permits and inspections with Louisville Metro or your local city or county office.
Get a free bathroom remodeling estimate
Tell us about your kitchen or bathroom. We'll call to set up a visit, measure the space and give you a written, line-item quote.
- Call or text(502) 586-2066
- Emailinfo@brproremodeling.com
- HoursMon–Fri 8am–6pm · Sat by appointment